How a Climateway project works.

We treat your home as one system, and we run the project as one project. Here are the five steps from first click to twelve-month performance review.

01

Climate Score

A free online assessment, completed in under two minutes, that benchmarks your home against the new British climate. Personalised to your postcode and property type, with an instant view of every grant you qualify for.

What's included

  • Personalised score across four metrics
  • Estimated grant eligibility
  • No technical knowledge required

Typical timeline

under two minutes, online.

Climateway Climate Score

02

Home Survey

A qualified assessor visits your home for a 90-minute physical survey. We measure, photograph, and thermally image — building a complete picture of how your house performs today.

What's included

  • On-site survey by a qualified assessor
  • Thermal imaging and airtightness check
  • Written Home Survey report

Typical timeline

90 minutes on site. £200, credited in full against your design fee.

Climateway Home Survey

03

System Design

We design your full climate system as a single integrated package — heating, cooling, ventilation, controls and fabric. We model the savings, apply for every grant you qualify for, and give you one fixed price.

What's included

  • Full system design and specification
  • Modelled energy savings
  • Grant applications managed for you
  • Fixed-price installation quote

Typical timeline

Included in the overall project timeline. £1,250 fixed design fee.

Climateway System Design

04

Installation

One project manager. One vetted team of engineers. One invoice. We sequence the works to keep your home livable throughout, and finish to a standard you can show off.

What's included

  • Single point of contact
  • All trades coordinated by Climateway
  • Daily progress updates
  • End-of-project commissioning

Typical timeline

Single-room cooling installation: 2 to 4 weeks total from Climate Score to install day. On-site install: 1 day. Standalone heat pump installation: 6 to 10 weeks total. On-site install: 2 to 5 days. Whole-home integrated systems: 12 to 20 weeks total. On-site install: 2 to 3 weeks.

Climateway Installation

05

Performance Year

Twelve months of remote monitoring. We watch how your home actually performs, review it against the design, and tune the system to keep it on track.

What's included

  • Twelve months remote monitoring
  • Annual performance report
  • Comfort Promise included

Typical timeline

12 months from handover.

Climateway Performance Year